• Commercial Fence
  • 7' chain link with mid-brace around generator fully enclosed
  • 8' tall chain link batting cage fence
  • Commercial Fencing Apple Valley
  • 6' chain link w/ barbed wire and no top rail
  • Oak Hills High School Footballl Fence
  • Commercial Fence-5
  • Commercial Fence
  • 3 strand barbwire and razor tape
  • 4' tall cable fence with toprail

Commercial Fencing

For the past 30 years, we’re proud to have been the High Desert area’s choice for commercial fencing and chain link fence installation for residences. After having worked for area governments, schools, and businesses, however, we have the commercial experience other area comercial fence companies can’t match.

Safer Fence, Safer Facility

From backstops to barb wire, a professionally installed commercial fence helps create a safer place for your workers, patrons, students, or guests. A must for installations requiring increased strength and durability like schools, prisons, and parking areas, our standard commercial fencing materials consist of sturdy 9 gauge mesh with schedule 40 posts and top rail. Projects can be created to fit the space you need, regardless of height or length, and topped with barb wire or razor ribbon for extra security.

Experience Matters

We have the experience other commercial fence companies lack. If you’ve been to an area park, government building, or just driven through a business area, you’ve seen our commercial fencing keeping the community safer. Whether outdoors or inside buildings, in asphalt or coring through concrete, we do it all.

Get a quote for your commercial fence installation. Contact All American Fence Erectors today.

Installation Process: 
Tools Icon
  • Get written estimate
  • Sign contract
  • Schedule start date
  • One-Two weeks to start
  • Most commercial jobs require a purchase order number prior to start
  • Day 1 set posts
  • 2-4 business days in between setting posts and stretching wire/hanging gates
  • Day 2 stretch wire and/or hang gates
Upon getting a written quote from our salesmen and once the contract has been signed we would then schedule a date to start.  Depending on how busy we are at that particular time will depend on how long it would take us to start.  Most jobs take one day to set all the posts, then one day to stretch all the wire and hang the gates.
 
NOTE: Usually, 2-4 business days between start to finish date for the concrete to cure properly and for time to build your gate(s).

 

Why Choose This?: 
Magnifying Glass Icon
  • Durability
  • Strength & Security
  • A must for public commercial sites
 
This is usually a must at schools, parks, prisons, or other public commercial sites where high strength and long durability is a must.  This kind of fencing, in coorporation with barb wire and/or razor tape, is the most secure form of chain link fencing available.  Always check with city (and county) codes for exact rules and regulations for your area if barbed wire and/or razor tape is desired.  Also if you’re a homeowner that has animals who have simply destroyed standard gauge chain link, then commercial gauge wire and/or posts might be a much more beneficial route for longevity.  Standard commercial fencing consists of 9GA Mesh with SCH. 40 posts and top rail.